Beyond the Storm: How Non-Hurricane Catastrophes Expose Florida’s Construction Defect Blind Spot
August 11, 2026 —
Franchesco “Frank” Soto & Amanda L. Gonzalez - Ball JanikOn June 8, 2026, a magnitude 6.1 earthquake struck the Gulf near the coast of Cuba, the largest instrumentally recorded earthquake in the Gulf since seismic monitoring began in 1950. Buildings swayed, offices were evacuated, and many residents along the east coast of Florida, from Miami-Dade to Jacksonville, felt the ground shake. Although no tsunami followed and reported structural damage was limited, this event exposed a blind spot that Florida property owners, developers, and their counsel cannot afford to ignore: catastrophic stress on Florida buildings does not always come in the form of a named storm.
Florida property owners have grown accustomed to preparing for wind, storm surge, floods, and torrential rain. Far less attention is paid to earthquakes, sinkholes, tornadoes, hail, and non-tropical flooding, each of which can place unexpected stress on buildings not designed with those forces top of mind and can trigger deficiencies in buildings that were not otherwise known, expose design failures, and create an urgency for both insurance claims and subsequent litigation.
Non-Hurricane Triggers of Latent Defects
Seismic activity is the clearest example. Florida’s building code accounts for wind loads, not seismic forces, meaning even a moderate earthquake can reveal weaknesses in curtain wall systems, structural connections, or foundations that were already marginal. Sinkholes, driven by Florida’s karst limestone geology, remain a persistent threat, particularly in Central Florida, where subsurface voids can undermine foundations without warning. Non-tropical flooding, like the record rainfall that flooded South Florida in June 2024, can intrude through building envelopes and waterproofing systems that were never stress-tested for such volumes of water. Tornadoes and hail, while more localized, can cause roofing and envelope failures that mimic, mask, or trigger latent construction defects.
The Litigation and Coverage Disputes That Follow
When one of these events strikes a building already carrying undisclosed or unresolved construction defects, the resulting disputes become considerably more complex. Property owners and associations must move quickly to document existing conditions and distinguish damage caused by the event from pre-existing defective construction, the same causation issue that arises in the hurricane context under Chapter 558, but often without the benefit of established precedent or adjuster experience with these less common events.
Insurance coverage disputes frequently follow close behind. Carriers may dispute whether an earthquake, flood, or other peril is covered at all, particularly where policies contain earthquake or flood exclusions requiring separate endorsements, or anti-concurrent causation language that can bar coverage entirely when a covered peril combines with an uncovered one, such as pre-existing defective construction, to cause a loss. Sinkhole claims carry their own statutory framework under Florida law, requiring specific testing protocols and reporting before a claim is compensable. Developers and contractors, in turn, may find themselves defending Chapter 558 claims while simultaneously litigating with their own carriers over defense and indemnity obligations.
Practical Risk Mitigation Strategies
Property owners, associations, and developers can take several concrete steps to reduce their exposure. First, maintain thorough documentation, including engineering reports, maintenance logs, and photographs, well before any event occurs. This documentation is often the deciding factor in causation disputes. Second, engage structural engineers and consultants immediately following any seismic event, unusual flooding, or storm damage, regardless of whether a hurricane is involved. Prompt inspection preserves evidence and can help prevent inadvertent waiver of construction defect claims. Third, review insurance policies regularly with counsel or a broker to confirm earthquake, flood, and sinkhole coverage matches the property’s actual risk profile, rather than assuming a standard property policy responds to every peril. Fourth, avoid rushing to remediate before conditions are documented and/or before consulting counsel. Well-intentioned repairs can inadvertently compromise evidence needed to prove a defect claim.
The June earthquake was a reminder that Florida’s catastrophic risk profile extends beyond hurricane season. Property owners, associations, and developers who build readiness plans around all forms of catastrophic stress, not just named storms, will be far better positioned when the next unexpected event occurs.
Franchesco “Frank” Soto is a partner in
Ball Janik’s Construction Defect Practice Group in Miami. He may be reached at fsoto@balljanik.com.
Amanda L. Gonzalez is a litigation attorney in
Ball Janik’s Construction Defect Practice Group in Miami. She may be reached at agonzalez@balljanik.com.
GRSM Defeats Class Certification in Precedent-Setting HOA Management Case
September 15, 2026 —
Gordon Rees Scully MansukhaniGordon Rees Scully Mansukhani Partners Fletcher Alford and Kevin Liu and Associate Jigar Desai secured a favorable outcome on behalf of an HOA management company in a precedent-setting class action before the U.S. District Court for the Eastern District of California, obtaining denial of the plaintiff’s motion for class certification and dismissal without prejudice of the three claims at issue.
The plaintiff alleged that the defendant received earnings credit payments from a bank in exchange for maintaining HOA deposit accounts and failed to disclose the arrangement to its HOA clients. The plaintiff sought more than $40 million in damages, asserting five claims: (1) breach of contract for failing to act in class members’ best interests by not disclosing the alleged earnings credit arrangement; (2) violation of California’s Unfair Competition Law (UCL) based on alleged violations of California Civil Code §§ 5375, 5375.5, and 5380; (3) breach of fiduciary duty based on the alleged undisclosed arrangement; (4) violation of the UCL for unfair business practices arising from the alleged nondisclosure; and (5) unjust enrichment. The plaintiff sought class certification under Federal Rule of Civil Procedure 23(b)(2) and 23(b)(3) only as to its second, third, and fourth causes of action.
Read the full story...Reprinted courtesy of
Gordon Rees Scully Mansukhani
ACEC Research Institute Report: Real Risk of AI Isn’t Technology. It’s the Org Chart.
September 01, 2026 —
ACEC Research InstituteWASHINGTON (August 19, 2026) – The ACEC Research Institute today released
Leading Through AI Risk: The Enterprise Framework for Engineering Firm Leaders, a new study finding that the most significant risks artificial intelligence poses to engineering firms are organizational rather than technological, and that firms treating AI as an IT initiative are managing the wrong issue.
The report, part of the Institute’s yearslong Firm of the Future initiative, combines an extensive literature review with in-depth interviews of 21 leaders drawn from engineering firms, public infrastructure owners, technology vendors, insurance and legal professionals, licensing and regulatory agencies, and AI consultants.
The report groups AI risk into eight interconnected domains:
- technical reliability and model risk
- professional liability and standard of care risk
- data governance, privacy, and intellectual property risk
- organizational and workforce risk
- ethical, regulatory, and reputational risk
- operational and cybersecurity risk
- financial and business model risk
- strategic leadership and enterprise governance risk
The last serves as the integrating domain through which firms coordinate responsible AI adoption enterprise wide.
The report stresses that firms do not experience these risks one at a time. Weak oversight may create legal liability. Workforce gaps may affect quality assurance. “Understanding these interactions,” the study notes, “is often more important than understanding individual risks independently.”
About the ACEC Research Institute
The ACEC Research Institute is the independent research arm of the American Council of Engineering Companies (ACEC). Its mission is to fund and deliver research to equip the engineering industry with actionable intelligence on the issues critical to its success. Learn more at www.acecresearchinstitute.org.
Doctrine of Substantial Performance When It Comes to Payment
July 27, 2026 —
David Adelstein - Florida Construction Legal UpdatesA recent non-construction case touches upon the doctrine of substantial performance when it comes to payment. In this case, a club was to make two payments to secure a rapper’s attendance. The first payment was made. The second payment was made but was a few hundred dollars short of the agreed amount. The rapper did not show up. The club claimed it substantially performed its obligations. At first glance, the argument makes sense because the second payment fell only a few hundred dollars short. But that wasn’t the case when it comes to pre-commencement payment obligations:
Substantial performance applies only when the variance from the contract terms “is inadvertent or unintentional and unimportant so that the work actually performed is substantially what was called for in the contract.” However, when one party agrees to pay the other on or before a specific date, time is of the essence, and the payor is required to pay the payee on or before that date. “There is almost always no such thing as ‘substantial performance’ of payment between commercial parties when the duty is simply the general one to pay. Payment is either made in the amount and on the date due, or it is not.”
Big Gate Records, LLC v. Washington, 51 Fla.L.Weekly D1281a (Fla. 2nd DCA 2026) (internal citations omitted).
Read the full story...Reprinted courtesy of
David Adelstein, Kirwin NorrisMr. Adelstein may be contacted at
dma@kirwinnorris.com
“The Superintendent Told Us to Do It:” Why Verbal Approval May Not Be Enough
June 02, 2026 —
Andrew Lintner - Colorado Construction Litigation BlogIn construction defect litigation, one scenario appears repeatedly: a subcontractor installs work in a manner that differs from the plans, specifications, manufacturer instructions, or industry standards after being verbally directed to do so by the general contractor, superintendent, architect, or owner’s representative.
At the time, the decision may seem minor. The project is moving quickly, the field team wants to maintain progress, and nobody wants to stop working over what appears to be a small issue. The subcontractor may trust the superintendent or project manager and assume the conversation will be remembered later if questions arise.
Years later, however, when the project experiences problems, the people involved may deny the conversation occurred, remember it differently, or simply no longer remember the project. Without written documentation, the subcontractor can find itself defending claims for defective work, even though it performed the installation exactly as directed.
Read the full story...Reprinted courtesy of
Andrew Lintner, Higgins, Hopkins, McLain & Roswell, LLCMr. Lintner may be contacted at
alintner@hhmrlaw.com
The Best Lawyers in America® - Ball Janik Attorneys Earn Multiple Recognitions
September 01, 2026 —
Ball Janik LLPOrlando, FL, August 20, 2026 – Ball Janik LLP is pleased to announce that 24 of its attorneys have been recognized in the 2027 editions of The Best Lawyers in America® and Best Lawyers: Ones to Watch® in America. The 33rd Best Lawyers edition recognitions are based on peer review and highlight attorneys across a range of practice areas. This recognition underscores the broad experience Ball Janik's attorneys bring to the firm's construction defect practice.
"We're proud to be recognized by Best Lawyers again this year," said James C. Prichard, Managing Partner of Ball Janik LLP. "These honors reflect the expertise and depth of our team, our continued growth across Florida, and our commitment to providing strong counsel to clients in complex construction, insurance recovery, and litigation matters."
Ball Janik attorneys recognized in the 2027 edition of The Best Lawyers in America® include:
Keegan A. Berry — Construction Law
Brian T. Crevasse — Construction Law; Litigation - Construction
Todd Demetriades — Litigation - Construction
Joseph R. Fitos — Construction Law; Litigation - Construction
Megan A. Picataggio — Construction Law
Jon E. Lemole — Construction Law; Litigation - Construction
Salvatore G. Scro — Construction Law
Nicholas B. Vargo — Construction Law; Litigation - Construction
Kelly M. Corcoran — Construction Law
Gabriel Z. Coelho — Construction Law
Evan J. Small — Construction Law; Litigation - Construction
Franchesco Soto — Construction Law; Litigation - Construction
Phillip E. Joseph — Litigation - Construction; Real Estate Law
James C. Prichard — Construction Law
Ball Janik attorneys recognized in the 2027 edition of Best Lawyers: Ones to Watch® in America include:
Nicholas Passantino — Litigation - Construction
Amanda L. Gonzalez — Construction Law; Litigation - Construction
Morgan N. Lester — Litigation - Construction
Chris S. Tribbey — Construction Law
Kyle Bugden — Construction Law; Litigation - Construction
Brian Tannenbaum — Construction Law
Kayla Mosquera — Insurance Law
Natasha L. Biela — Commercial Litigation
Elijah C. Waring, Jr. — Product Liability Litigation - Defendants
Greg K. Demers — Construction Law
About Ball Janik LLP
Ball Janik LLP is a Florida-based law firm offering construction defect, construction law, insurance recovery, and commercial litigation counsel, to its local and national clients. The firm was founded in 1982 and has expanded its capabilities, professionals, and geographic footprint. What started as a small firm focused on real property, land use, and litigation (known then as Ball Janik & Novack) has grown to a team of 70-plus attorneys and paralegals in five offices in Florida, with centuries of combined experience and capabilities. The firm has been recognized by Chambers USA, including for its construction law capabilities in Florida, U.S. News & World Report and Best Lawyers®, The Best Lawyers in America©, Super Lawyers, and Corporate International. Read more at www.balljanik.com.
Don’t Forget to Include Termination Language in Your Contract
November 02, 2026 —
David Adelstein - Florida Construction Legal UpdatesA recent case explains why termination language or a basis to withhold contract sums is important in your contract. Don’t neglect this language or the negotiation that goes into having this language.
In a recent dispute, GSD Contracting, LLC v. All American Builders & Debris Removal, Inc., 2026 WL 3068422 (Fla. 4th CA 2026), a subcontract included language that said that 10% retainage would be paid 90 days after final completion of the project. The subcontract did NOT include termination for cause language; it only included termination for convenience language. Towards the end of the project, mold was discovered warranting mold remediation. The subcontractor refused to perform until the mold was remediated. The general contractor claimed it was remediated but the subcontractor argued the remediation was insufficient because the contractor did not engage an industrial hygienist. After the subcontractor refused to complete its work, the general contractor terminated the subcontractor for cause. The subcontractor then sued the general contractor for its 10% retainage claiming the general contractor breached the subcontract. The trial court, as affirmed by the appellate court, agreed. The appellate court found that the contract required the general contractor to pay the subcontractor’s retainage 90 days after final completion and the project had long been completed. “Significantly, the subcontract does not contain a termination for cause provision or any pertinent provision permitting [the general contractor] to withhold or retain [the subcontractor’s] retainage following a termination…Nothing in the subcontract provides that [the general contractor] may thereafter withhold the retainage based on an alleged default by [the subcontractor].” GSD Contracting, supra, at *2.
Read the full story...Reprinted courtesy of
David Adelstein, Kirwin NorrisMr. Adelstein may be contacted at
dma@kirwinnorris.com
Nomos LLP Partner Garret Murai Recognized by Super Lawyers
July 13, 2026 —
Garret D. Murai - California Construction Law BlogNomos LLP Partner Garret Murai has been recognized as a 2026 Northern California Super Lawyer honoree in the area of Construction Litigation. This is the thirteenth consecutive year he has been recognized by Super Lawyers.
Super Lawyers, an annual listing of outstanding lawyers from more than 70 practice areas who have attained a high degree of peer recognition and personal achievement, is limited to no more than five percent (5%) of lawyers in a state who are selected through a multiphase process that includes a statewide survey of lawyers, independent research evaluation and peer reviews by practice area.
Read the full story...Reprinted courtesy of
Garret D. Murai, Nomos LLPMr. Murai may be contacted at
gmurai@nomosllp.com